Need some advice?
Leave your details and we will get in touch.
I want to be contacted by an expert1 /
The introduction of the new building safety regime in the UK has brought significant changes to how developments are assessed, approved, and regulated—particularly in the context of Higher-Risk Buildings (HRBs). A crucial but often misunderstood concept within this framework is the role of independent sections in determining whether a development falls within the HRB regime or not and, therefore, whether it must go through the Building Safety Regulator (BSR) or more Traditional Building Control Body (BCB).
Under the Building Safety Act 2022 and the associated secondary legislation, an HRB is typically defined as a building that is at least 18 metres in height or has at least 7 storeys, and contains at least two residential units. This definition triggers specific requirements, such as applications through the BSR at Gateway 2 (building control approval) and Gateway 3 (completion/final certification).
A key nuance in determining whether a project qualifies as an HRB is whether the building consists of independent sections. This distinction becomes especially relevant in mixed-use developments, phased developments, or buildings that contain a mix of residential and non-residential spaces.
An independent section refers to a part of a building that follows the key requirements within The Higher-Risk Buildings (Descriptions and Supplementary Provisions) Regulations 2023. This includes operating and being accessed separately to the HRB.
The presence of independent sections allows for a more granular assessment. For example:
If a particular section of a development can be deemed independent and does not meet the HRB threshold on its own, it may fall outside the scope of the HRB regime. This has several implications:
HRB: Must be submitted to the BSR for Gateway 2 and Gateway 3 approval, with oversight by a Multi-Disciplinary Team (MDT).
Non-HRB: Can proceed through traditional building control routes via Local Authorities or Registered Building Control Approvers (RBCAs).
Engaging with the BSR can introduce additional review periods and procedural requirements, potentially impacting project timelines.
Identifying and justifying non-HRB sections early in the design process may streamline approvals and reduce administrative burden.
It is essential to provide clear justification, supported by architectural and fire strategy documents, for treating parts of a development as independent.
This includes demonstrating that the section is structurally, mechanically, and operationally self-contained.
Reduced regulatory delay
Fewer legal liabilities
Faster Transaction times
Regulatory speed for minor changes.
Increased Marketability
Project and Development Planning – Value can be added to any project with reduced lead times for development and procurement.
Designating an commercial space within a HRB can increase demand and can lead to higher rental yields and faster occupancy.
The concept of independent sections is not just a technicality—it is a pivotal factor in navigating the new regulatory landscape under the Building Safety Act. A strategic and well-evidenced approach to identifying HRBs and non-HRBs within a development can offer real efficiencies while maintaining compliance and safety.
If you're planning a complex or phased project, or if you're unsure how your development aligns with the HRB definitions, engaging early with our SOCOTEC Building Risk and Compliance team is essential
To learn more about our Building Risk and Compliance services, please visit Building Risk and Compliance
For all Building Risk and Compliance enquiries, enquire below or call 02033847730.